(18.217.228.35)
Users online: 8738     
Ijournet
Email id
 

Arya Bhatta Journal of Mathematics and Informatics
Year : 2014, Volume : 6, Issue : 2
First page : ( 299) Last page : ( 304)
Print ISSN : 0975-7139.

Availability analysis of two different units system with a standby having imperfect switch over device in banking industry

Kumar Surender1,*, Dr. Goel Pardeep2,**

1Research Scholar, JJT University, Jhunjhunu (Rajasthan)

2Associate Prof., M. M. (PG) College, Fatehabad -125050 (Haryana)

*E-mail: surendergarg26004@gmail.com

**pardeepgoel1958@gmail.com

Online published on 10 February, 2015.

Abstract

In this paper the availability analysis of a banking industry with two unit redundant system having imperfect switch using Regenerative point Graphical Technique (RPGT) is discussed. Initially two non identical units are operative and one unit if kept as standby. The standby put online with the help of an imperfect switch. The failure and repair rates are taken as exponential and system is discussed with the help of tables.

Top

Keywords

Availability, Reliability, Primary Circuits, Secondary Circuits, Tertiary Circuits, Base-State, Regenerative Point Graphical Technique (RPGT), MTSF, Busy Period of the Server, Expected No. of Server's Visits, Cold Stand-by, Imperfect Switch.

Top

 
║ Site map ║ Privacy Policy ║ Copyright ║ Terms & Conditions ║ Page Rank Tool
744,396,646 visitor(s) since 30th May, 2005.
All rights reserved. Site designed and maintained by DIVA ENTERPRISES PVT. LTD..
Note: Please use Internet Explorer (6.0 or above). Some functionalities may not work in other browsers.