Two Stage Flow Shop Scheduling Problem with Involving Transportation Time for Job Blocks in Fuzzy Environment

Ambika G.*, Dr. Uthra G.**

*Assistant Professor, SKR Engineering College, Department of Mathematics, Chennai, India

**Assistant Professor, Pachaiyappa's College, Department of Mathematics, Chennai, India

Online published on 14 October, 2016.

Abstract

This paper consists of afuzzy flow shop scheduling problem whose objective is to minimize the total elapsed timeof jobs involvingjob block. The processing time setup time and transportation time are taken as triangular fuzzy numbers which are defuzzified into crisp ones by Yager's method. The optimal sequence is found by Johnson's algorithm and the minimum totalelapsed time is found. The approach is illustrated by a numerical example.

Top

Keywords

Transportation time, Job blocks, Optimal sequence, Total elapsed time.

Top

  
║ Site map ║ Privacy Policy ║ Copyright ║ Terms & Conditions ║ Page Rank Tool
744,558,864 visitor(s) since 30th May, 2005.
All rights reserved. Site designed and maintained by DIVA ENTERPRISES PVT. LTD..
Note: Please use Internet Explorer (6.0 or above). Some functionalities may not work in other browsers.