|
|
(18.116.67.212)
|
Users online: 15327
|
|
|
|
|
|
Ijournet
|
|
|
|
|
TAI Journal (A Half Yearly Technical Journal of Indian Chapter of TAI)
Year 2016, Volume-5, Issue-2 (July)
Print ISSN : 2277-2820
Online ISSN : 2278-4713 Table of contents Conventional & TBM Tunnelling Contracting-Risk Management-Achievements-Prospects Harald Wagner Conventional Tunneling Challenges in the Himalayas: A Case Study Rakesh Kumar Khali, Sharanappa Yalal Full-scale Tests on Precast Tunnel Segments Infiber Reinforced Concrete Angelo Caratelli, Alberto Meda, Zila Rinaldi, Benoit De RIVAZ Safety Aspects in Tunnel & Underground Construction Works M.M. Madan The Way Ahead: Excavation of the tunnel access to the new Grosvenor longwall coal mine in Queensland, Australia was achieved via TBM methodology-A first for the state's mining industry Sally Spencer Normet Product Solutions for TBM Tunnelling-A Make in India Solutions for Cost Optimisation Milon Mukhopadhyay Influence of Insitu Stress on the Alignment of Head Race Tunnel due to the Intersection of Anticlines at one of the Hydroelectric Projects D.S. Subrahmanyam, G. Shyam, K. Vamshidhar, S. Vikram Editorial V.K. Kanjlia Top |
|
|
|
|
║ Site map
║
Privacy Policy ║ Copyright ║ Terms & Conditions ║
|
|
751,063,412 visitor(s) since 30th May, 2005.
|
All rights reserved. Site designed and maintained by DIVA ENTERPRISES PVT. LTD..
|
Note: Please use Internet Explorer (6.0 or above). Some functionalities may not work in other browsers.
|