TAI Journal (A Half Yearly Technical Journal of Indian Chapter of TAI)
Year 2018, Volume-7, Issue-2 (July)
Print ISSN : 2277-2820
Online ISSN : 2278-4713 Table of contents From the President Desk Dr. Mangu Singh Editorial V.K. Kanjlia Design and Construction of Bored Tunnels for Mumbai Metro Line 3 S.K. Gupta, Makarand G. Khare, John D. Celentano Construction of Tehri Pump Storage Project (4x250 MW)-Innovation in Technology in Vertical Shafts and Tail Race Tunnels Rakesh Kumar Khali The Impact of Geological Uncertainties on Contract Management on Construction of Highway Tunnel in Himalayas: A Case Study Anil Kumar, Manish Kapil, L.M. Singh, P. Goyal Case Study on Metro Tunnel below the River Ganges in Kolkata, India Biswanath Dewanjee Tunneling under Dense & Dilapidated Urban Agglomeration-Delhi Gate-Jama Masjid Corridor-Delhi Metro Rail Corporation Limited (DMRC) Ujwal Kumar, Sushil Kumar Gupta Advanced Developments in Steel and RC Immersed Tunnels Hideki Sakaeda, Ozturk Ozgur, Chor Kin Tsang Finite Element Analysis of Factors Affecting the Ground Movements & Geotechnical Capacity Loss Induced due to Shield Tunnels Animesh Sharma Optimization of Underground Station Box Size for Phase-IV of Delhi MRTS Anoop Kumar Gupta, Abdhesh Kumar Singh, Rajesh Kumar Jain Inspection, Repair and Maintenance of Tunnels at Pong Dam Project-A Case Study Devendra Kr. Sharma, S.K. Sharma, Tarlochan Singh Importance of Earthquake Resistant Design of Underground Caverns/Tunnels Jaswant S. Kapoor, Vivek Chand Engineering Geological Evaluation of Rock Mass of the Transformer Cavern-A Case Study from Lift Irrigation Project, India D.S. Rawat, A.K. Naithani, G. Srinivasa Rao, Khilap Singh, R.N.S. Babu World tunnel congress 2018 in Dubai: The middle east consolidated its position as powerful emergent market
Normet's service and manufacturing facility inaugurated in India
TAI News
Top |