(3.17.152.183)
Users online: 16521     
Ijournet
Email id
 

TAI Journal (A Half Yearly Technical Journal of Indian Chapter of TAI)
Year : 2018, Volume : 7, Issue : 2
First page : ( 5) Last page : ( 11)
Print ISSN : 2277-2820. Online ISSN : 2278-4713.

Design and Construction of Bored Tunnels for Mumbai Metro Line 3

Gupta S.K.1, Khare Makarand G.2, Celentano John D.2

1Mumbai Metro Rail Corporation Ltd. (MMRC)

2AECOM

Online published on 20 April, 2019.

Abstract

This paper discusses the challenges in design and construction of the complete underground Mumbai Metro Line 3 in the city centre of Mumbai, which is the fi nancial capital of India and home to about 22 million people. The Mumbai Metro Line 3, which is a 33.5 kilometre fully underground corridor, is presently under construction. The project scope includes 33.5 kilometre of twin tube tunnelling by tunnel boring machines (TBM). The hydrogeological conditions of Mumbai, challenges posed by tunnelling under existing buildings and its impact on choice of TBM types adopted in the project are described. The design approval process for TBM selection and design features of each TBM type are discussed.

Top

Keywords

Mumbai, Hydrogeology, TBM Tunnels, Design, Construction.

Top

  
║ Site map ║ Privacy Policy ║ Copyright ║ Terms & Conditions ║ Page Rank Tool
751,649,213 visitor(s) since 30th May, 2005.
All rights reserved. Site designed and maintained by DIVA ENTERPRISES PVT. LTD..
Note: Please use Internet Explorer (6.0 or above). Some functionalities may not work in other browsers.